Skip to content
Slide 1
Contact Us

All Building Control Certification Limited is fully licensed by the Government ( via the Construction Industry Council )

Image is not available

Contact Us

Include an email and phone number so visitors can get in touch with you on their first attempt.

1-3 Brixton Road Unit 3.12 Chester House Oval SW9 6DE

Follow Us

Quick Contact

    Case Studies

    All Building Control is London based and nationwide, some of our areas include...

    All Building Control is London based and nationwide, some of our areas include...

    Book a Site Inspection

    *Due to the events of last year our services are taking slightly longer, we appreciate your patience.

    Declaration and Request for Final Certificate by Client, Principal Designer, and Principal Contractor

    1) I/we confirm that I/we have fulfilled our obligations in respect of Principal Designer / Principal Contractor as defined in Regulation 16E of The Building (Approved Inspector etc.) Regulations 2010 and Part 2A (duty holders and competence) of the Building Regulations 2010 (as amended). As far as I/we are reasonably and practicably able to ascertain, the works, to the best of our knowledge, comply with the Building Regulations. I/we therefore formally request issue of the Final Certificate.

    2) I/we confirm that as the person carrying out the work, I/we have passed all pertinent fire safety information to the responsible person (RP) as required by Regulation 38 of the Building Regulations such that they may adequately and reasonably fulfil their ongoing obligation under the RR(FS)O.

      I am the:

      Date Appointed:

      Upload Signature: