Skip to content
Slide 1
Building Control

All Building Control Certification Limited is fully licensed by the Government ( via the Construction Industry Council )

Image is not available
Slide 1
Building Control

All Building Control Certification Limited is fully licensed by the Government ( via the Construction Industry Council )

Image is not available

Welcome to
All Building Control

Building Surveyors London, here at All Building Control we were formed as a London-based Corporate Approved Inspector in 2013 and since then have developed into a highly focused and professional team offering Building Control Approval and associated Consultancy Services.
All Building Control is based in London, therefore we cover all areas of London so you do not need the inconvenience or uncertainty of applying to a different local authority every time you start a new job.

Consultancy

Our exposure to many types of buildings, especially in a city as complex and diverse as London, allows us to…

Building Control

All Building Control Certification Limited is fully licensed by the Government (via the Construction Industry Council…

Why Us?

Along with our core Statutory Building Regulation service we offer a variety of other service tailored to your needs.
Operate a ISO 9001:2015 Quality Management System.
RICS (Royal Institute of Chartered Surveyors) Chartered and Regulated practice
London-based and can operate in any area of England or Wales.
Licensed and Independently Audited by the CIC (Construction Industry Council)
Carry Professional Indemnity and Public Liability insurance
Operate a Bespoke Project Database

Building
Regulations

Along with our core Statutory Building Regulation service we offer a variety of other services tailored to your needs.

Previous slide
Next slide

Lets Work Together

Being a Corporate Approved Inspector the primary service we offer is Building Control Services London which essentially consists of plans checking and site inspections of your building works.

Fire Safety

Fire Safety is one of the core subject matters for any Building Control professional.

Legal & Dispute Resolution

Building Regulations compliance is not always as clear cut and as you might think.

Party Wall

We have been assisting clients with Party Wall Act 1996 matters for some time.

Latest News

Building Expo London

London Build Expo 2023

All Building Control spent two days at the prestigious London Build Expo 2023, where our team delved into a realm of innovation, collaboration, and industry insights. As we navigated the expansive venue, we
Read More
chartered surveyors

Time to Learn More About the Validity of Each Type of Property Survey

A property survey is a crucial need to keep a tab on its structural elements. With the help of a chartered surveyor, you would be able to perform a complete
Read More
Chartered Surveyors St Johns wood

An Ultimate Guide To Understand The Different Types Of Survey

Are you buying a house or just want to get a survey done to be sure of the structural strength of your property? People are often confused about choosing the
Read More

Book a Site Inspection

*Due to the events of last year our services are taking slightly longer, we appreciate your patience.

Declaration and Request for Final Certificate by Client, Principal Designer, and Principal Contractor

1) I/we confirm that I/we have fulfilled our obligations in respect of Principal Designer / Principal Contractor as defined in Regulation 16E of The Building (Approved Inspector etc.) Regulations 2010 and Part 2A (duty holders and competence) of the Building Regulations 2010 (as amended). As far as I/we are reasonably and practicably able to ascertain, the works, to the best of our knowledge, comply with the Building Regulations. I/we therefore formally request issue of the Final Certificate.

2) I/we confirm that as the person carrying out the work, I/we have passed all pertinent fire safety information to the responsible person (RP) as required by Regulation 38 of the Building Regulations such that they may adequately and reasonably fulfil their ongoing obligation under the RR(FS)O.

    I am the:

    Date Appointed:

    Upload Signature: